banner-desktop banner-mobile

StageGate

The 2019 Determination on the maximum level of Airport Charges at Dublin Airport introduced a new process for certain large-scale capex projects, known as StageGate. StageGate is a rolling iterative process intended to add flexibility for the scope and/or cost of the StageGate projects to develop over the regulatory period. The outcome of the StageGate process drives the final level of remuneration for the project over its asset life.

On this page, we publish materials relating to the StageGate process, including the quarterly concluding reports for each cycle.

 November 2024StageGate Concluding Report Iteration 3 2024
 July 2024StageGate Concluding Report Iteration 2 2024
 May 2024StageGate Concluding Report Iteration 1 2024
 February 2024StageGate Concluding Report Iteration 3 2023
 October 2023StageGate Concluding Report Iteration 2 2023
 June 2023StageGate Concluding Report Iteration 1 2023
 March 2021StageGate Concluding Report Iteration 2 2020/2021
 July 2020StageGate Concluding Report Iteration 1 2020
 June 2019

Consultation on StageGate process